Ongoing water pipeline upgrading works on the Njeng’u – Kibaki’s section. 850 meters.
The technical team has been working on the Njeng’u section of the Mweiga supply network upgrading the pipes from 6 inch uPVC TO 8 inch HDPE. This will increase water pressure thus addressing the frequent water interruption experienced in the region.